The following must always be observed:
To ensure correct operation of the connection tting this must only be installed in frost-free rooms. The
safety valve outlet must be open and able to be examined and the outlet pipe from the drip catcher (ex-
pansion water funnel) must not lead directly outside so that malfunctions cannot be caused by frost or
clogging through soiling. Care must be taken to ensure that the drip cup is not clogged.
Care must also be taken to ensure that the safety valve outlet pipe is installed at a constant downwards
inclination.
No shut-o valve or other restriction device may be installed between the safety valve and the cold water
inlet of the tank. The safety valve must be set to actuate at a pressure less than the rated pressure of the
tank (6 bar). The cold water supply pipe must be ushed before nal connection of the tank. The dischar-
ge openings of the safety valves (domestic water and heating circuits) must open out into an appropriate
drainage object in order to avoid any damage caused by the escape of operating uid.
The connection tting must be checked for correct operation after the water supply has been connected
and the tank has been lled, free of air bubbles.
a) To avoid blocking of the safety valve venting mechanism due to limescale, the safety valve venting
mechanism should be manually actuated from time to time while the system is in operation. The valve
must close once more when the venting mechanism is released and the vented water must ow com-
pletely out of the funnel or venting pipe.
b) In the case of safety valves installed before water heaters, the safety valve must actuate when the water
heater is heating up. This can be seen though water escaping from the venting line.
To be performed by: Operator, installation company
Interval: Every 6 months
Maintenance and repairs:
If water does not escape when hot water is being heated, or the safety valve leaks permanently, then an
attempt should be made to release the valve or ush any foreign bodies (e.g. calcium carbonate particles)
from the valve seal, via multiple actuation of the venting mechanism.
If this does not succeed, then an authorised installation company must repair the system. In the case of
damage to the valve seat or seal, the safety valve must be completely replaced.
To be performed by: Installation company
Interval: Annually
To check the backow valve the shut-o valve is closed and then no water should ow out of the open
test valve.
The tank is operated vie the hot water valve of the outlet tap (mixing taps). The tank is therefore per-
manently under pipe pressure. To protect the internal boiler against overpressure when heating up, the
expansion water created is dispersed through the safety valve. Calcied safety valves must always be
replaced to avoid overpressure damage to the hot water heater. In the case of a loss of supply pressure,
the backow valve prevents hot water from owing into the cold water piping network and thus protects
the boiler from being heated without water. The shut-o valve allows the tank to be disconnected from
the water supply and thus also from the cold water pipe pressure, which allows it to be drained via the
drainage valve.

Chat with your Austria Email EKF manual using AI

Get instant AI answers from your Austria Email EKF manual

Ask anything about the Austria Email EKF. Answers come from this manual, with the pages they are based on.

EKF Maintenance Schedule

Remind me when maintenance is due
Monthly
Check safety valve operation

Lift or turn the safety valve test knob to the Test position to ensure water flows unhindered into the funnel. Ensure the valve closes after release.

Show in the manual (page 33)
Every 6 months
Test safety valve venting mechanism

Manually actuate the venting mechanism to prevent blockage by limescale and verify water escapes completely during heating cycles.

Show in the manual (page 30)
Yearly
Inspect and repair safety valve

An authorized installer must check for permanent leaks or failure to open, attempting to clear foreign bodies or replacing the valve if damaged.

Show in the manual (page 30)
Every 2 years
Check sacrificial anode

A professional must inspect the integrated sacrificial anode to maintain warranty eligibility and replace it if necessary.

Show in the manual (page 33)
Every 2 years
Remove internal scale deposits

In areas with hard water, a professional must remove limescale from the internal tank via the flange opening without using descaling pumps.

Show in the manual (page 33)

Free maintenance reminders

Timed to your purchase date. Always free, unsubscribe anytime.

By submitting you agree to the privacy policy. Unsubscribe with one click in any email.
M: QW-35-FL

Ask a Question

0/1000

Do you recommend EKF?

Yes No

Frequently Asked Questions

A

The EKF series is offered in four nominal tank volumes: 70 L, 100 L, 120 L and 150 L, covering small to larger household hot-water demands.

Is this answer helpful?

A

No. Installation, plumbing connections, electrical wiring and initial commissioning must be performed by qualified, licensed specialists to comply with safety standards and warranty conditions.

Is this answer helpful?

A

The manufacturer recommends the middle position (~65 °C) as a balance between energy efficiency, hygiene and reduced limescale. The thermostat can be restricted to a maximum of 65 °C to prevent accidental scalding.

Is this answer helpful?

A

Measured standby energy consumption at 65 °C over 24 hours is approximately: 70 L = 1.08 kWh, 100 L = 1.23 kWh, 120 L = 1.48 kWh, 150 L = 1.79 kWh, depending on model and insulation quality.

Is this answer helpful?

A

Regular maintenance includes monthly safety-valve checks, professional anode inspection every 2 years, and descaling/cleaning by a technician every 1–2 years in hard-water areas. Use only original spare parts to preserve warranty.

Is this answer helpful?

A

Pressure-tight installation requires a tested membrane safety-valve or safety-valve combination (shut-off, test, non-return, drain and safety valve) and proper drainage for expansion water. No shut-off valve may be placed between the safety valve and cold-water inlet.

Is this answer helpful?

A

A residual-current device (RCD) with tripping current IΔn ≤ 30 mA must be installed upstream. An all-pole disconnect with 3 mm contact opening is required in the supply line and the factory wiring must not be altered except per documented rewiring options by a qualified electrician.

Is this answer helpful?

M: OA-GPT-5-NAN

Advantages and Disadvantages

Advantages

  • Low standby energy consumption due to high-quality CFC-free PU foam insulation.
  • Straightforward front-panel controls: thermostat knob, remote thermometer, and indicator lamp.
  • Multiple capacity options (70–150 L) to suit household hot-water needs.
  • Safety features include temperature limiter (110 °C) and mandatory membrane safety-valve connection.
  • Flexible electrical wiring options for 230 V single-phase and 3~400 V three-phase in larger models.
VS

Disadvantages

  • Installation and initial commissioning require licensed professionals—no DIY allowed.
  • Periodic professional maintenance needed (anode check, scale removal) to retain warranty.
  • Sensitive to water quality; minimum conductivity and filtration recommended to avoid corrosion.
  • Warranty voided by improper connections, mixed-metal installations or non-original parts.
  • Temperature accuracy limited by thermostat hysteresis and piping losses (±10 K possible).
M: OA-GPT-5-NAN

Product Specification

Energy efficiency class

C

Rated power

2kW (230V)

Temperature control

50-185°F

Design

closed (pressure resistant)

Mounting type

Wall mounting

Connection

1/2"

Special features

Frost protection

Noise level

15dB(A)

M: OA-GPT-54-NAN

Product Description

Austria Email Flat-Tank Water Heater EKF — Manual Overview

The Austria Email Flat-Tank Water Heater EKF is a compact, wall-mountable electric storage tank designed for domestic hot water supply. Engineered with an enamelled internal boiler and CFC-free PU foam insulation, the EKF series (70, 100, 120, 150 L) balances efficient heat retention with straightforward operation. A front control panel houses the thermostat knob, remote thermometer and heating indicator lamp for easy monitoring and adjustment.

Key features and operation

The heater warms potable water via an electric immersion heater and maintains temperature using an adjustable thermostat with four marked positions: frost protection (~30 °C), hand-warm (~40 °C), recommended economical position (~65 °C) and high temperature (~85 °C). The thermostat includes hysteresis (~±7 K), and the temperature readout can vary by ±10 K due to piping losses. Standby energy consumption is low thanks to high-quality PU insulation; measured 24h standby losses at 65 °C are 1.08–1.79 kWh depending on capacity.

The EKF supports multiple wiring/heat-up configurations (single- and three-phase for larger models) and includes factory-set 6‑hour heat-up wiring for 230 V. Safety features include a safety temperature limiter (cuts off at 110 °C), mandatory membrane safety valve combination for pressure-tight connection, and a requirement for a residual-current device (IΔn ≤ 30 mA) upstream of the circuit. Installation, electrical connection and first commissioning must be performed by qualified professionals.

Practical guidance

Choose the tank capacity based on household hot water needs (guideline tables included: baths, showers, dishwashing, etc.). For energy savings and reduced scale, set the thermostat only as high as required — 65 °C is recommended as a balance between hygiene, energy use and limescale control. In hard-water areas, consider pre-filtration or limiting max temperature to 65 °C. Routine maintenance includes periodic safety valve testing, inspection/replacement of the sacrificial anode every two years, and scale removal by a professional every 1–2 years if required.

Installation and safety notes

Mount vertically using the supplied wall rail or place on level floor supports where applicable; account for filled weight. The tank must be installed in frost-free, accessible locations with appropriate drain arrangements for safety-valve discharge. Factory wiring must not be altered except via specified rewiring options by qualified technicians. Use original spare parts and follow local codes and manufacturer instructions to maintain warranty.

Notes

  • Models: EKF-70, EKF-100, EKF-120, EKF-150
  • Standby kWh/24h (65 °C): 70L=1.08; 100L=1.23; 120L=1.48; 150L=1.79
  • Service: electrical and plumbing work must be by licensed specialists
  • Warranty contingent on correct installation, documented anode checks, and use of original parts